Enjoy 10% off your first order with code FIRST10 — max $500 discount. Start an Instant Quotehello@rivcut.com
CNC machined aerospace part Precision aerospace component
On-Demand CNC Platform

Precision Landing Gear Components
Machining

We machine landing gear components for Los Angeles aerospace teams. Gear struts, torque links, actuator bodies, and brake calipers from 4340 steel, 300M, and titanium 6Al-4V.

Securely upload your 3D CAD file for immediate pricing and DFM feedback.

Tight-Tolerance Machining
Fast Engineering Review
Documentation-Ready Support
Confidential Project Handling
5-Axis
Multi-axis capability
for complex geometries
RivCut capability
±0.001"
Standard tolerances
on milled features
RivCut standard
3-Day
Rush turnaround
available on prototypes
Simple geometries
ITAR
Compliant machining for
Los Angeles projects
Controlled processes

CNC Machined Landing Gear Components for Aerospace Teams

Landing gear teams in Los Angeles need parts that are strong, precise, and traceable. We machine 4340 steel, 300M, and titanium 6Al-4V landing gear components with tight bore tolerances. CMM inspection and AS9100D-aligned documentation on every order.

1

High-Strength Alloys

4340 steel, 300M, and titanium 6Al-4V with mill certs and traceability.

2

Bore Precision

±0.0005" on critical pin bores and sealing surfaces. CMM verified.

3

AS9100D Docs

Inspection reports and traceability for landing gear program records.

The Aerospace Capital of the World

Los Angeles is the birthplace of American aerospace — SpaceX builds Falcon and Starship hardware in Hawthorne, Northrop Grumman assembles the B-21 Raider in Palmdale, Boeing operates satellite programs in El Segundo, and Relativity Space and Rocket Lab push next-gen launch vehicle manufacturing across the metro. JPL in Pasadena drives deep-space exploration machining demand.

RivCut gives LA aerospace teams instant quoting and fixed lead times with AS9100-grade quality — flight-critical parts from prototypes to production without the queue.

SpaceX

Falcon 9, Falcon Heavy, and Starship launch vehicle manufacturing in Hawthorne

Northrop Grumman

B-21 Raider stealth bomber assembly in Palmdale

Boeing Satellite Systems

Commercial and military satellite manufacturing in El Segundo

Relativity Space

3D-printed launch vehicle development in Long Beach

What Los Angeles Aerospace Teams Usually Order

Typical quantity5-25 prototype or qualification parts
Common materialsAluminum 7075-T6, Titanium Ti-6Al-4V, Stainless Steel 17-4 PH
Key requirementFull AS9102 First Article Inspection Report with material traceability for every part
Typical lead time10-15 business days for prototype; 15-25 business days for production runs
Who ordersProcurement engineer or supply chain manager at an aerospace prime or Tier 2 subcontractor

Landing Gear Parts for Los Angeles Teams

Struts, torque links, actuator bodies, and brake components machined to print.

Gear Struts & Cylinders

4340 and 300M steel gear struts and actuating cylinders. Tight bore tolerances, sealing grooves, and chrome prep surfaces.

4340 & 300M

Torque Links & Scissors

Titanium and steel torque link assemblies with precision bore fits and surface hardness requirements.

Ti & steel

Actuator Bodies

Steel and titanium hydraulic actuator bodies for gear retraction. Precise bore and port machining.

Hydraulic ports

Brake Calipers

Aluminum and titanium brake caliper housings with precise piston bores and fluid port locations.

Al & Ti

Wheel Bearings & Hubs

Steel and titanium wheel bearing housings and axle hubs. Precise bearing race bores and runout requirements.

Precision bores

Downlock Mechanisms

Steel and titanium downlock hooks, links, and spring housings for gear sequencing systems.

Safety critical
Materials
7075 Al, 2024 Al, Ti 6Al-4V, Inconel 718, 300M Steel
Tolerances
Down to ±0.0005"
Finishes
Anodize, Chem Film, Cadmium, Passivation
Documentation
AS9100D certs & full traceability
Case Study
Landing Gear Trunnion Fitting
6 units · 5-axis from 300M steel billet · Regional jet program
Material
300M Steel
Tolerance
±0.0005"
Surface
Ra 32 µin
Lead Time
10 business days

6 Fittings. 10 Days. Zero Concessions.

A South Bay landing gear team needed trunnion fittings from 300M steel with tight bore concentricity, cadmium plating prep, and full dimensional verification. Teams near companies like SpaceX trust this kind of precision and documentation rigor.

Every part shipped with complete documentation:

  • CMM dimensional report — bore concentricity and true position verified
  • Material cert with heat lot and AMS 6417 compliance
  • First Article Inspection per AS9102
  • Pre-plate surface preparation verification
Aerospace CNC Bracket
Precision Aerospace Component
7075 Aluminum CNC Part
7075 Aluminum Machining

What Los Angeles Aerospace Buyers Should Know

Confirm your supplier's Nadcap accreditations for NDT, heat treat, and welding

SpaceX, Northrop, and Boeing in LA all require Nadcap callouts.

Ask about exotic alloy machining experience

LA aerospace programs frequently spec Inconel 718, Ti-6Al-4V, and A286 stainless.

Request lead time commitments in writing with liquidated-damage clauses

LA's aerospace cluster means your supplier is juggling multiple prime programs simultaneously.

When Your Local Shop Can't Keep Up

When a prime surges volume, local shops push you back in the queue. We give you fixed lead times, instant quoting, and aerospace-grade documentation — every time. Los Angeles's aerospace sector demands it.

Documentation-Ready

Dimensional reports, material certs, and process records ship with every order — no chasing paperwork after delivery.

Full Material Traceability

Every bar ships with mill certs and heat lot numbers. Full chain of custody from raw stock to finished part.

CMM Inspection, Every Part

NIST-traceable CMM verification on every critical dimension before anything ships. No sampling — we inspect every part.

5–7 Day Prototype Turnaround

Most first articles ship in under a week. Rush available for simpler geometries. Confirmed ship date at order.

Quality Standards & Certifications
Active
NIST-Traceable CMM
All measuring equipment calibrated to NIST standards. CMM inspection on every order.
Active
Material Traceability
Every order ships with mill certs, heat lot numbers, and material test reports.
Active
AS9100D
AS9100D-aligned documentation ready on request. Structured for your quality audits.
Active
NADCAP
NADCAP documentation structured for receiving inspection.

Need our full quality documentation? Email us — we'll send everything your team needs.

From File to Part in 3 Steps

Simple, clear, and designed for fast-moving teams.

Step 1

Upload & Quote

Upload your STEP or IGES file, select material and finish, and get an instant AI price. Every quote includes a free DFM review.

Step 2

We Machine & Inspect

Parts run on our CNC mills and lathes with CMM inspection on every order. We verify every critical dimension before shipping.

Step 3

Ship with Full Docs

Your order ships with dimensional reports, material certs, and full paperwork — everything your quality team needs.

Questions from Los Angeles Aerospace Teams

Yes. We machine gear struts, torque links, and actuator bodies for aerospace companies across the US, including Los Angeles, California. Upload your STEP file for instant pricing.
We machine 4340 steel, 300M steel, titanium 6Al-4V, and 17-4 PH stainless for landing gear applications. All material ships with mill certs. Teams working near companies like SpaceX in Los Angeles count on this level of precision.
We hold ±0.001" on general features and ±0.0005" on critical pin bores, bushing fits, and sealing surfaces. CMM inspection on every landing gear order.
Most landing gear prototypes ship in 7 to 10 business days. High-strength steel parts require additional tooling setup time.
We machine titanium and corrosion-resistant steel options that reduce dependence on hard chrome for landing gear components.
Upload your STEP at rivcut.com/quote or email hello@rivcut.com with your material and tolerance requirements.

Aerospace CNC Machining in Other Cities

We serve aerospace teams in cities across the US.

Upload Your CAD File

Landing Gear Components, structural brackets, housings, and more — we machine them all. Most orders ship in 5 to 7 business days.

No minimums · 100% Made in USA · Never brokered · Ships anywhere in the US

Currently accepting new projects