Enjoy 10% off your first order with code FIRST10 — max $500 discount. Start an Instant Quotehello@rivcut.com
CMM inspection of CNC machined part First article inspection report
On-Demand CNC Platform

Quality Assurance &
CMM Inspection

Every CNC part we machine gets CMM inspection, documented results, and a full traceability package — included at no extra charge. Your quality team gets what it needs, every time.

Securely upload your 3D CAD file for immediate pricing and DFM feedback.

98%
CMM inspected
before shipping
Every order, every part
±0.0001"
CMM measurement
accuracy
NIST-traceable calibration
Full
Material traceability
on every metal order
Mill certs & heat lots
$0
Extra charge for
inspection & reports
Included standard

What Is Quality Assurance in CNC Machining?

Quality assurance in CNC machining is the process of verifying that every machined part meets drawing specifications before it ships. It includes dimensional inspection using a CMM (coordinate measuring machine), GD&T verification, material certification, and documentation that proves your parts are correct. At RivCut, QA is not an add-on — it is built into every order.
1

Machine to Spec

Parts are CNC machined to your drawing tolerances using calibrated equipment and verified toolpaths.

2

CMM Inspect

Every critical dimension is measured on our CMM. Actual values are compared to nominal specs.

3

Document & Ship

Inspection reports, material certs, and conformance documents ship with your parts.

Built-In Quality on Every Order

Most shops charge extra for inspection. We include it as standard — because shipping uninspected parts is not an option.

CMM on Every Order

Every order gets CMM inspection before shipping. We measure critical dimensions and compare actual values to your drawing tolerances. No exceptions, no extra charge.

NIST-Traceable Equipment

Our CMM and gauges are calibrated to NIST-traceable standards. Measurement accuracy to ±0.0001". Your quality team can trust the numbers.

Full Documentation

Dimensional inspection reports, material certs with heat lot traceability, first article reports, and certificates of conformance. Everything ships with your parts.

Industry-Specific Compliance

We support aerospace, defense, medical, and automotive documentation requirements. AS9100-style records, FAI reports, and MIL-STD-ready paperwork available.

Upload CAD for Instant Quote

Quality Assurance Services

From first article inspection to surface roughness testing — every measurement documented and traceable.

CMM Inspection

Full 3D coordinate measurement of critical dimensions, hole positions, angles, and geometric features. Every measurement compared to your drawing tolerances.

±0.0001" accuracy

First Article Inspection (FAI)

Complete measurement of the first part from every production run. Detailed report with actual vs. nominal values for every ballooned dimension. You approve before we continue.

Full balloon report

GD&T Verification

Flatness, parallelism, perpendicularity, position, runout, concentricity, and true position. If your drawing calls it out, we measure and report it. See our GD&T reference guide for symbol definitions.

All GD&T callouts

Material Certifications

Every metal order ships with a mill cert proving alloy, heat lot, and chemical composition. Full traceability from raw stock to finished part.

Heat lot traceability

Surface Roughness Testing

Profilometer measurement of surface finish (Ra values). Verify mating surfaces, sealing faces, and cosmetic requirements meet your spec.

Ra measurement

Certificate of Conformance

Formal documentation stating that parts conform to purchase order specifications. Supports receiving inspection and quality system requirements.

Ships with every order
First article inspection of aerospace bracket at RivCut
CMM Verified — All Critical Dimensions Passed

First Article Inspection — Aerospace Bracket — 7075-T6

Machined and inspected for an aerospace customer requiring full FAI documentation. Every critical dimension verified on our CMM before shipping.

100%
FAI pass rate
on first submission
47
Critical dimensions
verified on CMM
CMM
Full data included
with shipment
24hr
Inspection turnaround
after machining
  • Dimensional inspection report (CMM data included)
  • Material certification & heat lot traceability
  • First article inspection report per AS9102
  • Certificate of Conformance per purchase order

Inspection. Traceability. Compliance.

Quality assurance is not optional at RivCut. Here is what you get on every order.

CMM Inspection

We measure before we ship. No exceptions.

  • 3D coordinate measurement
  • GD&T verification
  • ±0.0001" measurement accuracy
  • Documented results on every order

Material Traceability

Every alloy traced from mill to your door.

  • Mill certs with heat lot numbers
  • Chemical composition verification
  • NIST-traceable calibration records
  • Raw stock to finished part tracking

Documentation Compliance

Paperwork your quality team actually needs.

  • First article inspection reports
  • Certificate of Conformance
  • AS9102 & MIL-STD-ready records
  • Custom formats on request

From CAD File to Inspected Parts

Three steps. Full documentation. No surprises at receiving.

Step 1

Get an Instant Quote

Send your STEP or IGES file. Select material, quantity, and finish. We review for manufacturability and respond fast.

Step 2

We Machine & Inspect

Your parts run on our CNC mills and lathes. Every order gets CMM inspection. We verify every critical dimension before anything ships.

Step 3

Ship with Full Docs

Parts ship with dimensional inspection reports, material certs, and all required documentation. Everything your quality team needs for receiving.

Questions About Quality Assurance

A CMM measures dimensions, positions, angles, and geometric tolerances on your part. It checks features like hole locations, flatness, parallelism, and more. Every measurement is compared to your drawing.
Yes. We measure the first part from every production run completely. You get a detailed report with actual vs. nominal values for every dimension. You approve it before we continue production.
Yes. We measure GD&T callouts including flatness, parallelism, perpendicularity, position, runout, and concentricity. If your drawing calls it out, we can measure it.
Yes. Every metal order ships with a material cert (mill cert). This document proves the alloy, heat lot, and chemical composition match your specification.
Our CMM measures to ±0.0001 inches. This is accurate enough for most precision CNC parts, including aerospace and medical applications.
No. CMM inspection is included with every order at no extra charge. Material certs and inspection reports come standard.
We inspect a statistical sample from every batch plus the first and last parts. For critical dimensions, we can inspect 100% of parts. Tell us what you need.
Yes. We handle ITAR-controlled projects with proper security protocols. Defense and aerospace customers can work with us confidently.
Inspection is part of our standard process. It does not add extra lead time to your order. Reports ship with your parts.
You don't need to request one. Every order ships with an inspection report. If you need a specific format or additional measurements, just let us know when you place your order.

Upload Your CAD File

Every order ships with CMM inspection, material certs, and full documentation — included at no extra charge.

No minimums · Single prototypes to production runs · Inspection included · Ships anywhere in the US

G Open in Gmail O Open in Outlook Y Open in Yahoo
@ Default Email App

RivCut AI Assistant

Ask about QA, inspection, materials, pricing

Hi! I'm RivCut's AI assistant. Ask me anything about quality assurance, CMM inspection, material certs, or documentation requirements.