Enjoy 10% off your first order with code FIRST10 — max $500 discount. Start an Instant Quotehello@rivcut.com
CNC machined avionics housing CNC machined titanium bracket
On-Demand CNC Platform

Real Parts.
Real Results.

From aerospace titanium brackets to semiconductor vacuum chambers — see how we solve real machining challenges with tight tolerances and fast turnarounds.

Upload your CAD file for immediate pricing and DFM feedback.

48
Case studies
completed
Across all industries
8
Industries
served
Aerospace to semiconductor
±0.0002″
Tightest tolerance
achieved
Satellite optical bench
3-Day
Fastest delivery
turnaround
Emergency rush projects
Avionics Housing
Aerospace

Avionics Housing

A Tier 1 aerospace supplier needed a line-replaceable avionics housing machined from solid 7075-T6...

Material: 7075-T6 Aluminum Lead Time: 4 business days
Read case study →
Inlet Guide Vane
Aerospace

Inlet Guide Vane

A turbine engine MRO company needed replacement inlet guide vanes for a legacy engine program. The...

Material: Inconel 718 (AMS 5662) Lead Time: 10 business days
Read case study →
Torque Link
Aerospace

Torque Link

A Tier 2 landing gear supplier needed prototype torque links for a new regional jet program. The...

Material: 4340 Steel (260–280 ksi UTS) Lead Time: 12 days (incl. heat treat)
Read case study →
Optical Bench Bracket
Aerospace

Optical Bench Bracket

A space hardware startup building a small-sat Earth observation payload needed an optical bench...

Material: 6061-T6 Aluminum (low outgassing) Lead Time: 7 business days
Read case study →
Structural Mounting Bracket
Aerospace

Structural Mounting Bracket

A commercial aerospace customer submitted a Ti 6Al-4V wing rib mounting bracket with...

Material: Ti 6Al-4V (Grade 5) Lead Time: 6 business days
Read case study →
UAV Motor Mount
Aerospace

UAV Motor Mount

A defense-adjacent drone company building a Group 3 UAV (55+ lbs) needed motor mount plates for...

Material: 7075-T6 Aluminum Lead Time: 5 business days
Read case study →
Brake Caliper Mounting Bracket
Automotive

Brake Caliper Mounting Bracket

A Tier 1 automotive supplier qualifying a new brake caliper design needed first-article parts with...

Material: 4340 Steel Lead Time: 10 days (incl. heat treat)
Read case study →
EV Battery Module Housing
Automotive

EV Battery Module Housing

An EV startup needed prototype battery module housings for thermal testing. The housing routes...

Material: 7075-T6 Aluminum Lead Time: 5 business days
Read case study →
EV Motor End Bell
Automotive

EV Motor End Bell

An electric motor startup building prototype traction motors for a light commercial EV needed end...

Material: 6061-T6 Aluminum Lead Time: 5 business days
Read case study →
Front Suspension Knuckle
Automotive

Front Suspension Knuckle

An EV startup developing their skateboard platform needed prototype front suspension knuckles for...

Material: 7075-T6 Aluminum Lead Time: 6 business days
Read case study →
Transmission Test Fixture
Automotive

Transmission Test Fixture

A Tier 1 transmission manufacturer needed precision test fixtures for their end-of-line gear mesh...

Material: 4140 Steel, 28–32 HRC Lead Time: 10 business days
Read case study →
Turbocharger Compressor Wheel
Automotive

Turbocharger Compressor Wheel

A performance aftermarket company developing a turbocharger upgrade for a popular sports car...

Material: 7075-T6 Aluminum Lead Time: 7 business days
Read case study →
Comms Housing
Defense

Comms Housing

A defense comms OEM needed a ruggedized housing for a field-deployed communications module exposed...

Material: Inconel 718 (AMS 5662) Lead Time: 8 business days
Read case study →
Encrypted Radio Chassis
Defense

Encrypted Radio Chassis

A communications OEM building encrypted tactical radios for a DoD program needed machined chassis...

Material: 6061-T6 Aluminum Lead Time: 8 business days
Read case study →
Missile Fin Actuator Bracket
Defense

Missile Fin Actuator Bracket

A defense prime subcontractor needed actuator mounting brackets for a guided missile fin assembly....

Material: Titanium 6Al-4V Lead Time: 6 business days
Read case study →
Night Vision Goggle Housing
Defense

Night Vision Goggle Housing

An optics integrator building next-gen night vision systems for a SOCOM program needed housings for...

Material: 6061-T6 Aluminum Lead Time: 5 business days
Read case study →
Optical Sensor Mount
Defense

Optical Sensor Mount

A defense integrator building an electro-optical targeting system needed a sensor mounting platform...

Material: 17-4 PH SS, H900 Lead Time: 5 business days
Read case study →
Periscope Mounting Bracket
Defense

Periscope Mounting Bracket

A vehicle integrator building armored reconnaissance vehicles needed periscope mounting brackets...

Material: 17-4 PH SS, H1025 Lead Time: 7 business days
Read case study →
AR Headset Frame
Consumer Electronics

AR Headset Frame

An AR/VR hardware startup building lightweight mixed-reality glasses needed a frame that holds...

Material: Titanium 6Al-4V Lead Time: 7 days
Read case study →
IoT Gateway Enclosure / Heat Sink
Consumer Electronics

IoT Gateway Enclosure / Heat Sink

A Bay Area IoT startup needed a functional enclosure prototype for their industrial gateway device....

Material: 6061-T6 Aluminum Lead Time: 6 days (2 under deadline)
Read case study →
Laptop Hinge Prototype (Left & Right)
Consumer Electronics

Laptop Hinge Prototype (Left & Right)

A consumer laptop maker developing an ultra-thin laptop needed functional hinge prototypes for...

Material: 17-4 PH Stainless Steel, Condition H900 Lead Time: 5 days
Read case study →
Smart Speaker Enclosure
Consumer Electronics

Smart Speaker Enclosure

An audio hardware startup building a premium smart speaker needed a single-piece machined aluminum...

Material: 6061-T6 Aluminum Lead Time: 8 days
Read case study →
Wearable Monitor Housing
Consumer Electronics

Wearable Monitor Housing

A wearable tech startup building a continuous glucose monitor needed housings for their clinical...

Material: Delrin (Acetal) — FDA-grade Lead Time: N/A
Read case study →
Wireless Charger Housing
Consumer Electronics

Wireless Charger Housing

A consumer electronics brand launching a premium wireless charger needed a housing that positions...

Material: 6061-T6 Aluminum Lead Time: 3 weeks (all 3 iterations)
Read case study →
Conveyor Drive Shaft
Industrial Equipment

Conveyor Drive Shaft

A food processing equipment company needed replacement drive shafts for their high-speed conveyor...

Material: 4340 Steel (38–42 HRC) Lead Time: 8 business days (incl. heat treat)
Read case study →
Heat Exchanger Tube Sheet
Industrial Equipment

Heat Exchanger Tube Sheet

A process equipment fabricator building a shell-and-tube heat exchanger for a pharmaceutical plant...

Material: 316L Stainless Steel Lead Time: 10 business days
Read case study →
Hydraulic Valve Body
Industrial Equipment

Hydraulic Valve Body

A chemical processing equipment manufacturer needed a custom hydraulic valve body machined from...

Material: Hastelloy C-276 Lead Time: 7 business days
Read case study →
Pneumatic Cylinder Body
Industrial Equipment

Pneumatic Cylinder Body

A packaging machinery OEM building custom pneumatic actuators for their high-speed carton folding...

Material: 4140 Steel Lead Time: 7 business days
Read case study →
Pressure Vessel Flange
Industrial Equipment

Pressure Vessel Flange

A chemical processing company building a reactor vessel for a high-temperature, high-pressure...

Material: Inconel 625 (ASTM B564) Lead Time: 10 business days
Read case study →
Pump Impeller (closed type)
Industrial Equipment

Pump Impeller (closed type)

A water treatment plant had a critical pump failure with a discontinued impeller — no CAD file, no...

Material: 316L Stainless Steel Lead Time: 3 days (emergency rush)
Read case study →
Endoscope Distal Tip
Medical Devices

Endoscope Distal Tip

A medical device startup building a single-use endoscope for GI procedures needed 50 micro-scale...

Material: 303 Stainless Steel Lead Time: 6 days
Read case study →
Insulin Pump Housing
Medical Devices

Insulin Pump Housing

A MedTech startup building a tubeless insulin patch pump needed a housing that attaches directly to...

Material: PEEK-OPTIMA (Invibio) Lead Time: 3–5 days per iteration
Read case study →
Microfluidic Manifold
Medical Devices

Microfluidic Manifold

A Bay Area MedTech startup needed a PEEK microfluidic manifold with 0.020″ internal channels for...

Material: PEEK (FDA-grade) Lead Time: 4 days per iteration
Read case study →
Orthopedic Drill Guide
Medical Devices

Orthopedic Drill Guide

An orthopedic device company needed patient-specific drill guides that sit on the femur and direct...

Material: 17-4 PH SS (H900) Lead Time: 7 days
Read case study →
Laparoscopic Instrument Jaw
Medical Devices

Laparoscopic Instrument Jaw

A medical device company developing a next-generation laparoscopic surgical instrument needed...

Material: 316L Stainless Steel Lead Time: 3 weeks (all iterations)
Read case study →
Spinal Interbody Trial
Medical Devices

Spinal Interbody Trial

A spine device company developing a new interbody fusion cage needed trial and sizing components...

Material: Ti 6Al-4V ELI (ASTM F136) Lead Time: 8 days
Read case study →
Actuator Gearbox Housing
Robotics & Automation

Actuator Gearbox Housing

An automation company building industrial pick-and-place systems needed to scale their actuator...

Material: 6061-T6 Aluminum Lead Time: 6 weeks (500 units)
Read case study →
Robot Arm Joint Housing
Robotics & Automation

Robot Arm Joint Housing

A robotics startup building collaborative robots for semiconductor wafer handling needed precision...

Material: Titanium 6Al-4V Lead Time: 5 business days
Read case study →
End Effector Gripper Jaw
Robotics & Automation

End Effector Gripper Jaw

A warehouse automation startup building a robotic pick-and-place system for e-commerce fulfillment...

Material: 4140 Steel (45–50 HRC) Lead Time: 8 business days
Read case study →
Linear Actuator Body
Robotics & Automation

Linear Actuator Body

An industrial automation company building custom linear actuators for semiconductor wafer handling...

Material: 303 Stainless Steel Lead Time: 6 business days
Read case study →
Mobile Robot Chassis Plate
Robotics & Automation

Mobile Robot Chassis Plate

A field robotics startup building pipeline inspection robots needed a structural chassis plate...

Material: 7075-T6 Aluminum Lead Time: 5 business days
Read case study →
Sensor Mounting Bracket
Robotics & Automation

Sensor Mounting Bracket

An AMR (autonomous mobile robot) company building warehouse navigation robots needed sensor...

Material: 6061-T6 Aluminum Lead Time: 5 business days
Read case study →
Electrostatic Chuck Base Plate
Semiconductor

Electrostatic Chuck Base Plate

An etch equipment company developing a new ESC (electrostatic chuck) assembly needed a base plate...

Material: 6061-T6 Aluminum Lead Time: 7 business days
Read case study →
Gas Delivery Manifold
Semiconductor

Gas Delivery Manifold

A semiconductor equipment manufacturer needed a gas delivery manifold for a plasma etch tool. The...

Material: 316L Stainless Steel Lead Time: 7 business days
Read case study →
Optical Metrology Stage Mount
Semiconductor

Optical Metrology Stage Mount

A metrology equipment maker building wafer inspection tools needed a stage mount that supports the...

Material: 316L Stainless Steel Lead Time: 8 business days
Read case study →
Burn-In Test Socket Housing
Semiconductor

Burn-In Test Socket Housing

A semiconductor test equipment company building custom burn-in sockets for automotive-grade IC...

Material: PEEK Lead Time: 5 business days
Read case study →
Vacuum Chamber Lid
Semiconductor

Vacuum Chamber Lid

A semiconductor equipment OEM building a new CVD (chemical vapor deposition) tool needed a chamber...

Material: 6061-T6 Aluminum Lead Time: 8 business days
Read case study →
Wafer Handling Fixture
Semiconductor

Wafer Handling Fixture

A semiconductor fab tooling team needed custom wafer handling fixtures for their automated transfer...

Material: 6061-T6 Aluminum Lead Time: 6 business days
Read case study →

Upload Your CAD File

Upload your CAD file for instant AI pricing and a free DFM review.

No minimums · 100% Made in USA · Never brokered · Ships anywhere in the US

G Open in Gmail O Open in Outlook Y Open in Yahoo
@ Default Email App